City of Bloomington, Illinois
Home MenuPermits & Fees
Dumpster Permit
Use this permit if you desire to place a dumpster, moving container (POD / U-Haul / etc.) or something similar in the City right of way or street. This permit should be submitted to the Engineering Division a minimum of 72 hours prior to the dumpster or moving container being delivered. Click or tap here to view the Dumpster Permit.
Traffic Control Permit
This application is used to obtain a Traffic Control permit for when any portion of the street or sidewalk needs to be blocked for any amount of time. It should be submitted to the Engineering Division a minimum of 72 hours prior to the work being started. Click or tap here to view the Traffic Control Permit.
Oversize/Overweight Permit
These permits allow the operation of vehicles or loads that exceed the legal maximum weight or size. They are only valid for streets under City of Bloomington jurisdiction. Unless stated otherwise on the permit: (1) Permit movements are only allowed from a half hour before sunrise to a half hour after sunset on weekdays and from a half hour before sunrise to noon on Saturday; (2) Permit movements are prohibited on Sunday and on New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day. Click or tap here to view the Oversize/Overweight Permit.
Schedule of Fees for Streets, Sidewalks, and Other Public Ways
City Council adopted a Schedule of Fees, including fees for permits and licenses. Below is a list of the most commonly-used permits and licenses that are administered by Public Works. However, additional permits and licenses may be required. Click or tap here to view the entire Schedule of Fees or see the table below.
| Permit Type | Fee | City Code |
|---|---|---|
| Public Sidewalk Construction Permit | $40 | 38-47(b) |
| Public Sidewalk Construction Permit (Construction Prior to Permit Issuance) | $70 | 38-47(b) |
| Street Closure Permit (Obstruct Sidewalk, Parkway, and/or Parking Lane) (Up to 2 weeks) | $40 | 38-78(a)(2) |
| Street Closure Permit (Obstruct Sidewalk, Parkway, and/or Parking Lane) (Up to 1 month) |
$70 | 38-78(a)(2) |
| Street Closure Permit (Obstruct Traffic Lane) | $10/day | 38-78(b)(2) |
| Street Closure Permit (Obstruct Traffic Lane) (Obstruction Prior to Permit Issuance) | $20/day | 38-78(b)(2) |
| Excavation Permit (No cut of curbing or pavement) | $40 | 38-87(b) |
| Excavation Permit (with cut of curbing or pavement) | $40 + deposit | 38-87(b) |
| Excavation Permit Water Main Deposit (with cut of curbing or pavement) | $100 | 38-87(b) |
| Excavation Permit Sewer Main Deposit (with cut of curbing or pavement) | $200 | 38-87(b) |
| Excavation Permit (Excavation Prior to Permit Issuance) | $80 | 38-87(b) |
| Driveway Approach Permit (Curb Cuts) | $40 | 38-123(c) |
| Driveway Approach Permit (Curb Cuts) (Construction Prior to Permit Issuance) | $80 | 38-123(c) |
| Erosion and Sediment Control (Less than 1 acre) | $65 | 24-6.3.4(b) |
| Erosion and Sediment Control (Greater than 1 acres, but less than or equal to 50 acres) | See Schedule of Fees | 38-87(b) |
| Erosion and Sediment Control (Greater than 50 acres) | See Schedule of Fees | 38-87(b) |
